"KD-C02" Two Components Polyurethane Waterproof Coating is a reactive waterproof coating formed from two components’ reaction, component A is polyurethane prepolymer, component B is a hardener. When use, we mix component A and B at a certain proportion. After being stirred well, it is coated on the construction base surface, then wait for hours’ reaction and curing. It forms a jointless, flexible and strong rubber waterproof layer.
NO. |
Item |
Technical index |
||
|
|
I |
II |
III |
1 |
Drying time |
12 |
||
2 |
Tensile strength |
2.0 |
6.0 |
12.0 |
3 |
Breaking elongation |
500 |
450 |
40 |
4 |
Flexibility at low temperature: |
-35 ℃ No cracks |
||
5 |
Impermeability, 120 min (0.3Mpa) |
no leakage |
·Excellent physical and mechanical properties: Composed of pure polyurethane, good rubber elasticity and resilience, high tensile strength, strong resistance to the deformation of base layer (shrinkage and cracking);
·Good bonding property, strong adhesion: be bonded with different base layers and directly constructed on the qualified base layers; the bonding strength is more than 1.0MPa;
·Good construction performance: two components mixed by a certain proportion and for use on-site, easy construction; brushing 2-3 times up to 2 mm thickness, dense coating, pinhole-free, no bubbles;
·Excellent water and corrosion resistance: forming film by chemical reactions, water erosion resistance, corrosion resistance, mildew resistance, especially suitable for long-term soaking parts of waterproof engineering constructions;
·Excellent low temperature flexibility: -35 ℃ low temperature bending without cracking, suitable for low temperature waterproof engineering constructions;
·Environmental friendly: high boiling point solvents, no benzene, toluene, xylene and any other toxic solvents, no coal tar;
·Apply to basement (basement of building, basement parking lot, open-cut subway and passageway), especially suitable for the base layer of basement engineering which is difficult for drying;
·Apply to bathroom,water pool,balcony, parking area;
·Apply to non-exposed roof waterproof engineering;
Contact: Pick
Phone: 0086-15866178739
Tel: 0086-15866178739
Email: pick@kedewaterproof.com
Add: Taitou waterproof Industry Zone, Shouguang,Shandong ,China
We chat