Home  >  Project

Project

  • The Changsha city Bridage project
The Changsha city Bridage project

The Changsha city bridage project


The project brief:

The Changsha city bridage longth is 800 meter long,width is the 40 meter.The summer is always hot and rainy;

Material:

"KD-M06"SBS Modified Bitumen Waterproof Membrane for Road and Bridge;

"KD-C07" Solvent-Based Type Rubber Bitumen Waterproof Coating;

PREVIOUS:The factory warkshop waterproof No next

CATEGORIES

CONTACT US

Contact: Pick

Phone: 0086-15866178739

Tel: 0086-15866178739

Email: pick@kedewaterproof.com

Add: Taitou waterproof Industry Zone, Shouguang,Shandong ,China